froedtert-and-the-medical-college-of-wisconsin-center-for-advanced-care
- Facts and Figures
-
Completed October 2015
$139,000,000
610,000 square feet
- Delivery Method
- Construction Manager
Completed October 2015
$139,000,000
610,000 square feet
Construction of the Froedtert & the Medical College of Wisconsin鈥檚 610,000 SF, eight-story Center for Advanced Care was completed in October 2015. Its name reflects the exceptional level of specialty care and medical technologies that are housed there, including the Heart and Vascular Center, Transplant Center, and integrated rooms for surgeries and interventional procedures.
More than 18,000 surgeries, including over 250 transplants, are performed at Froedtert Hospital each year. The new building brings together surgical, interventional, and intensive care areas on a single, centrally located floor. Their proximity to each other helps eliminate redundancy, enhance patient flow and safety, optimize operational efficiency, and support new technology adoption. Few hospitals in the nation have created this integrated environment.
Best New Development or Renovation - Healthcare, Real Estate Awards 鈥� Milwaukee Business Journal, 2016
Best in Show 鈥� The Daily Reporter, 2015
Top Project 鈥� The Daily Reporter, 2015
Showcase Award, Impact Achievement 鈥� WCREW, 2016
Project Delivery & Construction Administration Excellence, AIA/TAP Innovation Awards 鈥� The American Institute of Architects (AIA), 2016
Concrete Design Award 鈥� Wisconsin Ready Mixed Concrete Association, 2015