Ridgegate Parkway Expansion

Can roadway widening construction include water/storm upgrades?

ridgegate-parkway-phase-2

Facts and Figures

$13,500,000

1 mile of new roadway

1.9 miles of existing roadway widening and upgrades

Completion: December 2020

Delivery Method
General Contractor

¾º²Ê×ãÇòapp was selected as the General Contractor to complete Phase 2 of the Ridgegate Parkway Expansion between I-25 and Meridian Village Parkway. Currently, at two lanes, Ridgegate Parkway will be expanded to four lanes, including an 8-foot wide sidewalk (pedestrian) and a 12-foot wide cycle track (bicycles). ¾º²Ê×ãÇòapp’s scope of work includes earthwork, roadway widening, water/storm upgrades, concrete flatwork, asphalt paving, and pedestrian